RESOURCES

  • Category

  • Content Type

Joint Comparison

Traditional concrete needs to be cut in anticipation of cracks, sawing joints every 12 – 16 feet. Curling and shrinkage occur at joints, causing deterioration,

Read More »

Tilt-up Memo

There are multiple references to the recommended minimum slab thickness offered by the Tilt-Up Concrete Association (TCA) in publications and resources.

Read More »

Coldbox Testimonial

Coldbox Builders Inc. (Coldbox) was tasked with converting an existing mid- sized ambient warehouse into a high-functioning refrigerated warehouse for its client in the food

Read More »